You're in control
Funds are released in stages throughout your build, with each progress payment approved by you. You can manage the process in the Westpac App or Online Banking. Sign in or search ‘Progress payment’ in the app to get started.
Enjoy flexible borrowing options
Choose from a range of home loan options, including our Flexi First Option, Rocket Repay and Fixed Options home loans. We can also support a variety of build types, including fixed price contracts, owner-builder projects, kit homes and cost plus contracts. If you're eligible, you may also be able to access government grants, schemes or concessions to help with the cost of building.
Stay on top of cash flow
You’ll only pay interest on the funds you've drawn down during construction (known as Interest Only repayments), helping keep your repayments lower while your build is underway.
What is a construction loan?
A construction loan (also known as a building loan) can help fund a new build, house and land package, renovation or home improvement project. Funds are released in stages as construction progresses, so you can pay for work as it's completed.
Learn more about construction loans and how they work.
How do construction loans work?
Availability
A construction loan option may be available for eligible owner occupiers and investors building or renovating a residential property. It’s designed to support construction for personal or investment property purposes, not dwellings intended to be sold immediately after completion.
Timing
Construction needs to start within 12 months and finish within 24 months of the first payment. We may arrange for a final inspection before the final payment is made.
Progress payments
Your loan is paid in stages as the build progresses. When the invoice or progress claim is received, check the work and if satisfied, approve the claim. We'll review your claim before the funds are released for the next stage of your build (known as progress payments).
Fees
There are no progress draw fees or additional bank fees on our construction loans. Other non-bank costs, such as valuation, progress inspection and quantity surveyor costs, may still apply.
Repayments and loan term
During construction, you only pay interest on the funds drawn down. After the final payment, your loan moves to your chosen repayment type.
Managing construction variations
If your plans, price or payment schedule change, speak to your home loan specialist or broker first. We may need to review the change, ask for documents, or arrange an updated valuation.
You'll need the following documents and information:
- Signed and dated building contract (including building stages and schedule of payments)
- Fixed price building contract (if you have one)
- Details of the land purchase (if applicable)
- Evidence of your deposit or available funds from your own savings
- Income and other financial circumstances information for your home loan application.
We'll look at how much you can afford to borrow and review the details of your building project. Keep in mind that construction loans can have stricter eligibility and credit approval requirements than traditional mortgages.
First home buyer?
You may be eligible for government support to help you buy or build your first home. Explore our first home buyer options or speak to us to find out more.
You can apply with the help of one of our home loan specialists or through your broker. As part of the application, we'll review:
- Your financial position (to decide how much you can afford to borrow)
- The land value
- The build costs
- Your builder and building contract, including the construction payment schedule if one is provided. Some contract types, such as cost plus contracts (including monthly progress payment contracts), and owner-builder arrangements, may not include a formal payment schedule.
If approved, you'll receive your loan contract and details of conditions that need to be met before settlement.
Important: You'll need to review and sign your loan contract and any required documents before proceeding.
At settlement:
- Funds may be released to purchase the land for construction (if applicable)
- Any customer contribution required is confirmed
- Your construction loan is established
- Westpac issues a ‘Builder’s commencement letter’ containing information explaining the building and payment process, plus the stages where progress inspections will be conducted.
Important: Before the first builder's payment, ensure you have ready to upload:
- Your council approved plans, and
- Your builder’s risk insurance (including public liability clause).
Note, if an inspection is required, allow an extra 4 to 5 business days for payment.
Once your builder is ready to commence:
- Construction starts
- Progress payments are requested as each stage is completed
- Westpac reviews payment requests
- Inspections or additional documentation may be required before payments are made.
How do I manage my construction loan progress payments?
From approval to final completion, this step-by-step guide provides key information on each stage of construction; helping you understand the process, manage progress payments and navigate your build with confidence.
Note: These five stages of Fund allocation are indicative only and down payments for construction loans typically range from 10% to 25% of the total cost. Your building contract and payment schedule (where required) apply. The below stages can vary in both numbers and activities, so are for guidance, only.
| Stage 1: Slab | 20% Fund allocation estimate |
|---|---|
| What’s happening | The site is prepared, foundations are laid and underground services may be installed. |
| Your next step |
|
| Required documents |
|
| What happens next | Westpac reviews the request and may arrange an inspection before paying the approved amount direct to your account to pay the builder. |
| Stage 2: Frame | 20% Fund allocation estimate |
|---|---|
| What’s happening | The structural frame and roof supports are built. Some roofing, windows or brickwork may also be installed. |
| Your next step |
|
| Required documents |
|
| What happens next | Westpac reviews the request and may arrange an inspection before paying the approved amount direct to your account to pay the builder. |
| Stage 3: Lock-up | 30% Fund allocation estimate |
|---|---|
| What’s happening | External walls, roofing, windows and doors are installed so the building can generally be secured. |
| Your next step |
|
| Required documents |
|
| What happens next | Westpac reviews the request and may arrange an inspection before paying the approved amount direct to your account to pay the builder. |
| Stage 4: Fit-out | 20% Fund allocation estimate |
|---|---|
| What’s happening | Internal walls, cabinetry, plumbing, electrical fittings and other fixtures are installed. |
| Your next step |
|
| Required documents |
|
| What happens next | Westpac reviews the request and may arrange an inspection before paying the approved amount direct to your account to pay the builder. |
| Stage 5: Completion | 10% Fund allocation estimate |
|---|---|
| What’s happening | Final fixtures, painting, detailing and site clean-up are completed, ready for handover. |
| Your next step |
|
| Required documents |
|
| What happens next |
|
- true
- true
- true
In short, progress payments work in the following way:
- Builder completes a stage.
- You check the work.
- You approve the claim.
- Important: Only approve a progress payment once you're satisfied the work has been completed as agreed. Raise any defects or concerns with your builder before payment is released.
- Westpac reviews your request.
- Westpac pays the approved amount into your account to pay the builder.
- Important: It is your responsibility to ensure your builder is paid in accordance with the terms of your building contract.
- New stage commences.
We recommend:
-
Check the stage is complete and meets your contract terms.
-
Resolve any concerns directly with your builder.
-
Check the invoice matches your approved payment schedule.
- Important: any payment amounts which differ from the original payment schedule on contract may result in processing delays.
- Owner-builder or cost plus contracts may not require a payment schedule.
-
Confirm any required customer contribution has been paid.
-
Have details of any approved variations ready.
-
Submit the claim only when you are comfortable approving payment.
Before the final payment is released, you'll need to provide updated building insurance and a satisfactory valuation confirming the build is complete.
See ‘How do I manage my construction loan progress payments?’ for more detail on what’s required when submitting a progress payment.
Yes. If you're buying a house and land package, your construction loan can be used to purchase the land first. Once construction begins, the remaining funds are released in stages as your build progresses.
If you're only buying land and not ready to build yet, you can apply for a standard Westpac home loan instead of a construction loan.
Already have a land loan with another lender? You may be able to refinance it to Westpac. Speak to us to explore your options.
Depending on your circumstances, you may be eligible for government grants, schemes, concessions or Westpac home loan benefits that could help reduce upfront costs, support your deposit, or improve your borrowing power.
Some options that may be available include:
- First Home Owner Grant (FHOG): If you're buying or building your first home, you may be eligible for a one-off government grant. Grant amounts, property value caps and eligibility requirements vary by state and territory.
- If you're eligible for this grant, the payment will be released once “Stage 1 Slab” is completed. Note, you cannot use the FHOG to pay the initial holding deposit.
- Australian Government 5% Deposit Scheme: Eligible first home buyers may be able to buy or build a home with as little as a 5% deposit without paying Lenders Mortgage Insurance (LMI). Eligible single parents or legal guardians may be able to purchase with a 2% deposit. Property types can include vacant land with a contract to build, house and land packages, off-the-plan properties and newly built homes.
- Professional Home Loans: Eligible healthcare and medical professionals may be able to access benefits such as LMI waivers[#], helping them borrow with a lower deposit. Eligible medical professionals and essential trade workers may also have 100% of eligible non-base income, such as allowances and overtime, considered when assessing borrowing capacity. These benefits may be available with a construction loan, subject to eligibility and lending criteria.
Eligibility requirements can change over time, so it's important to check the latest details before relying on a grant, scheme, concession or other support as part of your budget.
Book an appointment with one of our home lending specialists to understand which options may be available to you.
- Fixed price contracts provide greater certainty by setting the construction cost upfront and have a schedule of payments. May be better suited for tight budgets.
- Cost plus contracts charge the actual cost of the build plus a builder's fee, which can offer flexibility but may result in higher costs if expenses increase.
- Structural renovations involve major changes to your home, such as removing walls, adding an extension or building another level.
- Non-structural renovations are cosmetic updates, such as painting or installing new flooring.
If a Quantity Surveyor (QS) report is required, you'll need to arrange and provide the report before funds can be released. The QS may also need to inspect the property at key stages of construction and confirm the work has been completed as planned before further progress payments can be made.
Any reports or additional information requested will need to be provided by you, and you'll be responsible for any associated costs. The report must be prepared and signed by a member or fellow of the Australian Institute of Quantity Surveyors (AIQS).
Award-winning value
Backed by Canstar’s 2026 Outstanding Value – Investment Variable Home Lender Award[#], helping you feel confident in your next investment.
I need help. Who can I contact?
If you need help with a construction loan, please contact the team that best matches where you are in your journey.
New home loan applications.
If you have questions before applying, or while preparing your construction loan application, speak to:
- Your Westpac Home Loan Specialist or broker
- Westpac Customer Contact Centre on 131 900
Existing applications or loans in progress.
If your construction loan is already in progress, contact our Mortgage Contact Centre for help with:
- Progress drawdowns or payments: 1300 367 483
- Loan changes or restructuring: 132 558